Home / Our Services / Piping Services
PIPING SERVICES SINGAPORE
ACMV Cooling Water & Chilled Water Piping
Installation of piping material such as black steel, carbon steel, galvanized steel with methods of arc welding, argon welding, threading and coupling. Insulation, hot-tapping, freezing and retrofit works. Is carried out with utmost professional staff with latest equipments and technology for the piping work.
Process Piping
Hook-up of utilities process piping to equipment, machines and production tools such as clean dry air (CDA), nitrogen (N2), process cooling water (PCW) and etc… with stainless steel pipe / tubes, plastics (uPVC, PP, PVDF) pipe.
Chilled Water Piping Services
In the modern world of construction and HVAC systems, the efficient and effective distribution of chilled water is of paramount importance for maintaining controlled and comfortable indoor environments. Chill water piping services play a vital role in ensuring the dependable and efficient supply of chilled water to various building components, such as air conditioning units, refrigeration systems, and even industrial processes.
Technological and engineering advancements have brought about significant changes in the realm of chilled water piping. These innovations have enhanced performance, sustainability, and cost-effectiveness.
At Lea Keong, our commitment has always been to provide our clients with solutions. To usher in a new era characterized by enhanced efficiency, sustainability, and cost-effectiveness in chilled water piping systems, we have made substantial investments in research and development.
Types of Pipes for Chilled Water Piping Systems and Their Common Usages
Types of Pipes | Material | Usage |
Steel Pipe | Steel (Carbon Steel) | ● Industrial and commercial structures ● Where corrosion resistance is crucial ● High-pressure applications |
Stainless Steel | ● High levels of corrosion resistance than copper | |
● Practically stronger material properties using in external areas | ||
Copper Pipe | Copper | ● Residential and commercial buildings ● HVAC systems ● Refrigeration systems |
PVC Pipe | Polyvinyl Chloride | ● Applications for low temperatures ● Drainage and wastewater systems |
Experience Excellence with Lea Keong
Lea Keong is dedicated to delivering quality services and solutions tailored to meet your unique requirements. Be it our chilled water piping service, advanced technologies, or any of our myriad solutions, we are here to meet your expectations.
Chilled Water Piping System
Pipe Sizes (Inches) | Pipe Standard | Typical Configuration / Temperature Range |
1/2″ – 2″ | Steel (Carbon Steel) | Commercial buildings |
2.5″ – 8″ | Steel (Carbon Steel) | Small to medium HVAC systems |
10″ and above | Steel (Carbon Steel) | Industrial settings |
½” – 2” | Stainless Steel | Industrial settings to equipment cooling |
2.5” – 6” | Stainless Steel | Equipment cooling system |
1/2″ – 2″ | Copper | HVAC Systems |
2.5″ – 8″ | Copper | Industrial and commercial structures |
1/2″ – 2″ | PVC (Polyvinyl Chloride) | Applications for low temperatures Wastewater and drainage systems |
2.5″ – 3″ | PVC (Polyvinyl Chloride) | Irrigation Systems |
Our Chilled Water Piping Installation Process
Initial Assessment and Planning
Before commencing the installation, a comprehensive initial assessment, including a site visit and client consultation, is conducted. During this phase, our team gains a deep understanding of the project’s specific requirements and objectives. Subsequently, we move on to the planning stage, where we design the chill water piping system and create detailed specifications that align with both customer needs and industry standards.
Material Selection and Procurement
The durability and effectiveness of the chilled water piping system are contingent on the choice of materials. Our experts carefully evaluate project requirements and specifications to determine the most suitable pipe material. Once the decision is made, we source high-quality pipes and fittings that adhere to relevant industry regulations and standards.
Preparations for Installation
Prior to installation, thorough preparations are made in the workspace. This involves the removal of any obstacles, ensuring the implementation of safety measures, and gathering the necessary tools and equipment for the installation process. A safe and well-organized work environment is essential for the successful and timely completion of the installation while mitigating potential risks.
Pipe Cutting and Assembly
The groundwork is laid before the actual installation of the chilled water piping system. Accurate measurements and cuts are made to the pipes to achieve the required lengths. Our team assembles the pipes with a keen focus on precise alignment and the application of appropriate joining methods such as welding, flanging, or coupling.
Testing and Quality Assurance
Quality control is a vital aspect of our installation process. After the system is assembled, it undergoes a thorough evaluation to ensure its integrity. Pressure testing is carried out to detect and address any potential leaks, guaranteeing a secure system. Flow rates and temperature performance are meticulously assessed to confirm adherence to design specifications.
Connection to Chiller
The chiller units and any related equipment are connected to the chilled water piping system. These connections are executed with precision and care to enable seamless integration. Our installation experts conduct a comprehensive inspection to ensure that all connections are secure and properly sealed
Basics of Chilled Water Piping System
We pride ourselves in establishing and maintaining excellent customer-supplier relationship, also continually taking the challenges of technological innovation and offering the best services to our customers.
Contact Us Today
- 5040 Ang Mo Kio Industrial Park 2 #01-457 Singapore 569543
- +65 6481 3264
- 6482 4291
- contact@leakeong.com
- www.facebook.com/leakeong
Find Us
Copyright © 2023 Leakeong